Navigation

Facility Projects Make Great Progress this Summer

Construction site of new building

今年夏天,皇冠app下载继续进行建筑项目,进一步加强学生学习和生活的空间. 捐助者的支持使学院得以推进这些计划.

New Academic Building

这个团队正在建造新的学术大楼,它将容纳不断增长的教学空间 communication and exercise and sports science programs and Meredith athletic 在4月30日的动工仪式后,取得了很大的进展. Underground utility work and grading began immediately. 在浇筑地基的混凝土和安装工字钢梁之后,这座建筑在7月中旬开始成形. Construction is expected to be complete during the 2021-22 academic year. 

The building, 毗邻Weatherspoon体育馆和Lowery健身中心, will be 13,636平方英尺,包括一个最先进的录音室, a podcast room, three editing rooms, 两间宽敞的运动和体育科学教室, a collaboration room, and additional classrooms.  

With both programs in the same building, 将有机会进行跨学科的工作,包括体育传播课程和以学生为基础的跨两个研究领域的项目.

“我们渴望让学生在高质量的环境中学习,并配备他们在工作中需要的设备. 同样重要的是,这些领域和活动与我们的世界正在发生的变化以及我们的学生为这个世界做准备的方式密切相关,” said President Jo Allen.

该建筑将完全开放,并将具有节能功能,如LED照明和特殊的屋顶,将减少建筑制冷需求. 为了增加建筑的美观,大堂将有一个水景和壁炉. 在大楼的正面和侧面也将有天井和18个办公室,用于沟通、运动和体育科学部门的负责人, and athletic staff. 

Watch a virtual walk through of the planned building.

Currently, Institutional Advancement is offering 个人和组织命名空间的机会 within the building, 允许捐赠者支持学生,进一步提高他们在皇冠app的教育水平. 

设计发展建筑师事务所设计了新大楼和内陆建设总部在加纳, N.C., is the general contractor.

Meredith Lake

皇冠app湖是皇冠app学生体验的一个组成部分. It is the site of classes, productions, small gatherings, 也是学生进行本科研究的宝贵校园资源.

2017年3月,由于管道和管道的侵蚀,该湖干涸了. At that time, 在一年一度的皇冠app·梅赫姆大赛上,女校友们为这个湖筹集了资金. 由于无法预见的障碍推迟了项目的开始, 湖和小岛正在被完全恢复为校园里的一个美丽的地方,供所有人欣赏.

今年已经取得了很大的进展,该湖及其周边地区将于9月20日完工21. 今年1月,围绕小岛的舱壁工程开始了. 建筑工人与大自然和异常高的气温作斗争当他们在岛屿周围挖掘,为新的挡土墙获得坚实的基础时,雨水不断增加. In some areas, they excavated more than 12 feet down and added over 1,500 tons of stone to ensure the footing was solid.

“The new wall is made up of concrete blocks, most weighing more than a Corvette, that interlock like legos to create 一个视觉上的愉悦和超级坚固的结构,将经得起时间的考验. 大坝上所有的树木都被清除了,大坝被重建得比以前更坚固,” said Todd Lechner, assistant facility manager and project manager.The new bridge was installed that connects to the island.

大坝还增加了高度和宽度,以满足国家委员会提供的100年风暴计算.  

In mid-August, 这座桥连接着小岛,这样人们就可以走过去,享受校园里一个安静的地方. Kellie Falk(ʼ85)和她的同学们的礼物使这一改造成为可能.

一旦完成,将为所有向湖泊捐赠的人举行庆祝活动.

Nutrition Lab

位于马丁厅(Martin Hall)的营养实验室今年夏天进行了重大翻修. 它将于2021年秋季学期完成并为学生们准备好. 新的实验室将为学生提供动手学习的经验,模拟他们将在皇冠app以外的环境中工作,如营养教育, sales, food service management, public policy or health fields, and the local and sustainable food industry.

The renovation was made possible by Roy Nifong, father of Marianne Nifong Raker, ʼ72, who was a home economics major at Meredith. The gift is in memory of his wife and Raker’s mother, Grace.

从5月开始,整个空间被拆除,该区域扩展到相邻的走廊. 更大的空间将在教室空间和实际厨房之间提供一种开放的感觉.Two construction workers moving equipment.

这里有所有新的煤气管道、电力、水和排水系统. 全尺寸罩系统安装了专用空调机组, 全新的暖通空调系统和排气罩系统. 

安装了可移动的搁架单元,便于教学和学习时的灵活性. A large pantry, walk-in freezer and refrigerators, three restaurant-grade ranges, convection oven, induction range with oven, multiple sinks, dishwasher, 新的工业厨房还包括了更多的设施. 

维克郡卫生部门在设计上进行了咨询,因此整个项目按照卫生部门的标准建造,并将给学生在商业环境中的真实体验. 

To see construction photos of the new spaces, visit cash-linkz.com/campus-growth.

Melyssa Allen

News Director
316 Johnson Hall
(919) 760-8087
Fax: (919) 760-8330

allenme@cash-linkz.com